The 16” Su Tu Vang – Rang Dong (ANSI 60#) underground gas pipeline was operated in 2009 in order to collect and transport associated gas from the Cuu Long basin. The associated gas was later joined to the Rang Dong – Bach Ho pipeline route through PLEM at the Rang Dong field. This 43.3 km pipeline is designed to lie on seabed surface with a depth of about 54m at the Su Tu Vang CPP platform at the Cuu Long field and 50m at the WHP – NE platform (operated by JVPC) at the Rang Dong field.