<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>2018 Archives - GreenStar Technical Services JSC</title>
	<atom:link href="https://gts.com.vn/portfolio/2018/feed/" rel="self" type="application/rss+xml" />
	<link>https://gts.com.vn/portfolio/2018/</link>
	<description>Together We Can</description>
	<lastBuildDate>Wed, 30 Mar 2022 08:28:39 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://gts.com.vn/wp-content/uploads/2018/12/cropped-ico-32x32.png</url>
	<title>2018 Archives - GreenStar Technical Services JSC</title>
	<link>https://gts.com.vn/portfolio/2018/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>PVEP POC P&#038;A – DH-3P Lockchem</title>
		<link>https://gts.com.vn/project/pvep-poc-p-a-dh-3p-lockchem/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Wed, 04 Jan 2017 10:37:10 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=394</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/pvep-poc-p-a-dh-3p-lockchem/">PVEP POC P&#038;A – DH-3P Lockchem</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Green Star positioning JSC was contracted by Thien Nam Offshore Services JSC (TOS) for the provision of positioning and navigation services to support the M/V Binh Minh  move to Dai Hung-01 for P&amp;A PVEP POC P&amp;A – DH-3P LOCKCHEM operation, Dai Hung field, Block 05.1a, Offshore, Vietnam.</p>
<p>These services comprised of the provision of personnel, positioning &amp; navigation equipment on the M/V Binh Minh  and ROV Quantum 4 for survey to obtain request in SOW. This report on positioning describes the scope of work and results during positioning and navigation.</p>
<h5>DAI HUNG FIELD DESCRIPTION</h5>
<p>The  Dai  Hung  field  is  located  in  Block  05.1a, approximately  250  km,  from  the  coastline  of  the  South  East  Vietnam,  and  situated  in  a water depth of 110 m (average). The field is operated by PVEP POC.</p>
<figure id="attachment_978" aria-describedby="caption-attachment-978" style="width: 422px" class="wp-caption aligncenter"><img fetchpriority="high" decoding="async" class=" wp-image-978" src="http://gspositioning.com/wp-content/uploads/2017/01/DaiHungField-300x135.png" alt="" width="422" height="190" srcset="https://gts.com.vn/wp-content/uploads/2017/01/DaiHungField-300x135.png 300w, https://gts.com.vn/wp-content/uploads/2017/01/DaiHungField.png 588w" sizes="(max-width: 422px) 100vw, 422px" /><figcaption id="caption-attachment-978" class="wp-caption-text">The location of DAI HUNG Field illustrated</figcaption></figure>
<p>The post <a href="https://gts.com.vn/project/pvep-poc-p-a-dh-3p-lockchem/">PVEP POC P&#038;A – DH-3P Lockchem</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Surveying and checking gas bubble which appears at the flange (spool segment) nearby the STV Platform of the 16” STV-RD pipeline route</title>
		<link>https://gts.com.vn/project/surveying-and-checking-gas-bubble-which-appears-at-the-flange-spool-segment-nearby-the-stv-platform-of-the-16-inch-stv-rd-pipeline-route/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Wed, 04 Jan 2017 10:34:56 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=393</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/surveying-and-checking-gas-bubble-which-appears-at-the-flange-spool-segment-nearby-the-stv-platform-of-the-16-inch-stv-rd-pipeline-route/">Surveying and checking gas bubble which appears at the flange (spool segment) nearby the STV Platform of the 16” STV-RD pipeline route</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The 16” Su Tu Vang – Rang Dong (ANSI 60#) underground gas pipeline was operated in 2009 in order to collect and transport associated gas from the Cuu Long basin. The associated gas was later joined to the Rang Dong – Bach Ho pipeline route through PLEM at the Rang Dong field. This 43.3 km pipeline is designed to lie on seabed surface with a depth of about 54m at the Su Tu Vang CPP platform at the Cuu Long field and 50m at the WHP – NE platform (operated by JVPC) at the Rang Dong field.</p>
<figure id="attachment_992" aria-describedby="caption-attachment-992" style="width: 449px" class="wp-caption aligncenter"><img decoding="async" class=" wp-image-992" src="http://gspositioning.com/wp-content/uploads/2017/01/stv-rd-292x300.png" alt="" width="449" height="461" srcset="https://gts.com.vn/wp-content/uploads/2017/01/stv-rd-292x300.png 292w, https://gts.com.vn/wp-content/uploads/2017/01/stv-rd-600x617.png 600w, https://gts.com.vn/wp-content/uploads/2017/01/stv-rd.png 726w" sizes="(max-width: 449px) 100vw, 449px" /><figcaption id="caption-attachment-992" class="wp-caption-text">Sơ đồ vị trí tuyến ống 16” STV-RD</figcaption></figure>
<p>The post <a href="https://gts.com.vn/project/surveying-and-checking-gas-bubble-which-appears-at-the-flange-spool-segment-nearby-the-stv-platform-of-the-16-inch-stv-rd-pipeline-route/">Surveying and checking gas bubble which appears at the flange (spool segment) nearby the STV Platform of the 16” STV-RD pipeline route</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MV12 &#8211; Underwater inspection of mooring chain system 2018</title>
		<link>https://gts.com.vn/project/mv12-underwater-inspection-of-mooring-chain-system-2018/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Wed, 04 Jan 2017 10:33:15 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=392</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/mv12-underwater-inspection-of-mooring-chain-system-2018/">MV12 &#8211; Underwater inspection of mooring chain system 2018</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Green Star positioning JSC was contracted by Thien Nam Offshore Services (TOS) for the provision of underwater positioning and navigation services to support the subsea positioning of a Remotely Operated Vehicle (ROV) based onboard the vessel M/V Binh Minh for project “MV12 &#8211; Underwater inspection of mooring chain system 2018” at Rong Doi, Rong Tay field, Block 11-2, Offshore, Vietnam.</p>
<p>These services comprised of the provision of personnel, underwater positioning &amp; navigation equipment to obtain request in SOW. This report on positioning describes the scope of work, methodologies and results during positioning and navigation during inspection.</p>
<figure id="attachment_989" aria-describedby="caption-attachment-989" style="width: 375px" class="wp-caption aligncenter"><img decoding="async" class=" wp-image-989" src="http://gspositioning.com/wp-content/uploads/2017/01/rongdoimv12-300x200.jpg" alt="" width="375" height="250" srcset="https://gts.com.vn/wp-content/uploads/2017/01/rongdoimv12-300x200.jpg 300w, https://gts.com.vn/wp-content/uploads/2017/01/rongdoimv12.jpg 500w" sizes="(max-width: 375px) 100vw, 375px" /><figcaption id="caption-attachment-989" class="wp-caption-text">Rong Doi MV12 Mooring chain System</figcaption></figure>
<p>The post <a href="https://gts.com.vn/project/mv12-underwater-inspection-of-mooring-chain-system-2018/">MV12 &#8211; Underwater inspection of mooring chain system 2018</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Jacket and pipeline survey operations at block 01/10 &#038; 02/10</title>
		<link>https://gts.com.vn/project/jacket-and-pipline-survey-operations-at-block-01-10-and-02-10/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Wed, 04 Jan 2017 10:32:04 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=391</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/jacket-and-pipline-survey-operations-at-block-01-10-and-02-10/">Jacket and pipeline survey operations at block 01/10 &#038; 02/10</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>As part of Ruby In-water Survey 2018, Green Star Positioning JSC (GSP) was contracted by Thien Nam Offshore Services (Client) for the provision of navigation and positioning with USBL and navigation software to support the sub-sea positioning of a Remotely Operated Vehicle (ROV) for full general visual inspection (GVI) based onboard of the vessel “MV Binh Minh” for surveying:</p>
<ul>
<li><strong>RBDP-A WHP</strong></li>
<li><strong>6” Gas Lift Pipeline from PLEM 7 to RBDP-B (2.393 Km length)</strong></li>
<li><strong>6” Gas Lift Pipeline from PLEM 5 to TPDP-A (15.3 Km length)</strong></li>
<li><strong>10” Production Crude Oil from TPDP-A to PLEM 3 (15.3 Km length)</strong></li>
</ul>
<p>The M/V Binh Minh Mobilized at Thuong Cang port in Vung Tau, Vietnam, The Mobilization of Thien Nam equipment’s commenced on the 30<sup>th</sup> September with as list below:</p>
<ul>
<li>DGNSS Veripos LD7 (Primary System)</li>
<li>TSS Meridian Surveyor Gyrocompass (Primary System)</li>
<li>GPS Veripos Gyro (Secondary System)</li>
<li>Teledyne TSS DMS-05 Motion Reference Unit</li>
<li>Valeport Mini SVP Sound Velocity Probe</li>
<li>QINSy 8.0 2010 Navigation Suite</li>
<li>USBL Sonardyne Scout Plus</li>
<li>Visual soft DVR and Visual soft Event</li>
<li>AutoCAD, AutoChart and Plotter</li>
</ul>
<p>All ROV mounted sensors were provided by Thien Nam Offshore Services, the ROV contractors for the project.</p>
<p>The post <a href="https://gts.com.vn/project/jacket-and-pipline-survey-operations-at-block-01-10-and-02-10/">Jacket and pipeline survey operations at block 01/10 &#038; 02/10</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tie-in spool Ca Tam</title>
		<link>https://gts.com.vn/project/tie-in-spool-ca-tam/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Wed, 04 Jan 2017 10:30:59 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=390</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/tie-in-spool-ca-tam/">Tie-in spool Ca Tam</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Green Star positioning JSC was contracted by Thien Nam Offshore Services JSC (TOS) for the provision of positioning and navigation services to support the Barge Swiber Concorde move to CTC1 JACKET for running anchor operation, Ca Tam Field, Block 09-3/12, Offshore, Vietnam.</p>
<p>These services comprised of the provision of personnel, positioning &amp; navigation equipment on the Barge Swiber Concorde; M/V PTSC Tien Phong and VT-101 ; the Bell of SAT for diving and ROV Quantum 3 for survey to obtain request in SOW. This report on positioning describes the scope of work, methodologies and results during positioning and navigation.</p>
<h5>CA TAM FIELD DESCRIPTION</h5>
<p>The &#8220;Ca Tam&#8221; Oil Field is located at Block 09-3/12, approximately 160 km South East of Vung Tau City, offshore the Socialist Republic of Vietnam. It belongs to Joint Venture of Vietsovpetro, PVEP and Bitexco. There are two wellhead platforms  . (CTC1  and CTC2) in the &#8220;Ca Tam&#8221; Oil Field  Development Plan. The CTC1 platform will be installed in the first stage and the CTC2 platform-  in future.</p>
<p>The CTC1 wellhead platform consists of Jacket with Boat Landing, MSF &#8211; Module Support Frame (Sub Main Deck), Topside with Vent Boom and Helideck. There are 12 well slots on the CTC1 platform. CTC1  platform topside facilities are able to accommodatethe processing of the well stream fluid, gaslift gas and water injection requirements as well as other utility systems.</p>
<p>The CTC 1   platform is connected to the nearest existing platforms located at the White Tiger, White Bear and Dragon oil fields, block 09-1, via subsea pipelines and cables.  Produced liquid of the CTC1  platform will be transported to the  RP2 platform at Dragon oil field for further processing. Separated gas &#8211; to CCP platform via BK14 (at White Tiger oil field) and GTC1  (at White Bear oil field) platforms. Gaslift gas and water injection for CTCl will be supplied from GTC1 platform via subsea pipelines.</p>
<p>The CTC 1   platform is designed as a hub platform which will be connected to and received products from the CTC2 platform via subsea pipelines and cables in future.</p>
<p>In first stage, the &#8220;Ca Tam Oil Field Development Project&#8221; includes 5 sub-projects called  &#8220;CTC1   Wellhead  Platform&#8221;,   &#8220;Subsea   Pipelines  and  Cables&#8221;,   &#8220;RP2 Modification&#8221;, &#8220;GTC1 Modification&#8221; and &#8220;BK14 Modification&#8221;.</p>
<figure id="attachment_984" aria-describedby="caption-attachment-984" style="width: 376px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class=" wp-image-984" src="http://gspositioning.com/wp-content/uploads/2017/01/catam-300x287.png" alt="" width="376" height="360" srcset="https://gts.com.vn/wp-content/uploads/2017/01/catam-300x287.png 300w, https://gts.com.vn/wp-content/uploads/2017/01/catam-600x574.png 600w, https://gts.com.vn/wp-content/uploads/2017/01/catam.png 616w" sizes="auto, (max-width: 376px) 100vw, 376px" /><figcaption id="caption-attachment-984" class="wp-caption-text">The location of CA TAM FIELD illustrated</figcaption></figure>
<p>The post <a href="https://gts.com.vn/project/tie-in-spool-ca-tam/">Tie-in spool Ca Tam</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Fabrication and installation of clamps for conductors of 21xp,23xp well</title>
		<link>https://gts.com.vn/project/installation-clamp-at-dh02/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Wed, 04 Jan 2017 10:29:39 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=389</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/installation-clamp-at-dh02/">Fabrication and installation of clamps for conductors of 21xp,23xp well</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Green Star positioning JSC was contracted by Thien Nam Offshore Services JSC (TOS) for the provision of positioning and navigation services to support the Barge Swiber Concorde move to Dai Hung-2 Platform for running anchor operation, Dai Hung field, Block 05.1a, Offshore, Vietnam.</p>
<p>These services comprised of the provision of personnel, positioning &amp; navigation equipment on the Barge Swiber Concorde; M/V PTSC Tien Phong and M/V “PTSC Thai Binh”; the Bell of SAT for diving and ROV Quantum 3 for survey to obtain request in SOW. This report on positioning describes the scope of work, methodologies and results during positioning and navigation.</p>
<h5>DAI HUNG FIELD DESCRIPTION</h5>
<p>The  Dai  Hung  field  is  located  in  Block  05.1a, approximately  250  km,  from  the  coastline  of  the  South  East  Vietnam,  and  situated  in  a water depth of 110 m (average). The field is operated by PVEP POC.</p>
<figure id="attachment_978" aria-describedby="caption-attachment-978" style="width: 389px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class=" wp-image-978" src="http://gspositioning.com/wp-content/uploads/2017/01/DaiHungField-300x135.png" alt="" width="389" height="175" srcset="https://gts.com.vn/wp-content/uploads/2017/01/DaiHungField-300x135.png 300w, https://gts.com.vn/wp-content/uploads/2017/01/DaiHungField.png 588w" sizes="auto, (max-width: 389px) 100vw, 389px" /><figcaption id="caption-attachment-978" class="wp-caption-text">The location of DAI HUNG Field illustrated</figcaption></figure>
<p>The post <a href="https://gts.com.vn/project/installation-clamp-at-dh02/">Fabrication and installation of clamps for conductors of 21xp,23xp well</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Offshore Pipeline External Survey And Jackets Inspection 2018 (PTT)</title>
		<link>https://gts.com.vn/project/offshore-pipeline-external-survey-and-jackets-inspection-2018-ptt/</link>
		
		<dc:creator><![CDATA[Long Lưu]]></dc:creator>
		<pubDate>Tue, 03 Jan 2017 15:23:33 +0000</pubDate>
				<guid isPermaLink="false">http://gspositioning.com/?post_type=fw-portfolio&#038;p=388</guid>

					<description><![CDATA[<p>Consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam&#8230;</p>
<p>The post <a href="https://gts.com.vn/project/offshore-pipeline-external-survey-and-jackets-inspection-2018-ptt/">Offshore Pipeline External Survey And Jackets Inspection 2018 (PTT)</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The PTT Offshore Pipeline External Survey 2018 Campaign is located in the Gulf of Thailand, mainly covering the pipelines between ERP, Bongkot, Arthit, GBS, and JDA.</p>
<p>This report presents the results of the external survey for PTT Public Company Limited pipelines survey within the inspection program covering the following pipeline and structures:</p>
<ol>
<li>32’’ x 171.3 km long spur pipeline from BKT to ERP</li>
<li>24’’ x 160.8 km long trunk pipeline from ERP to KNM</li>
<li>24’’ x 18.5 km long connecting pipeline from ACPP to 42” PLEM</li>
<li>42’’ x 260.2 km long spur pipeline from JDA KP60.4 to ERP</li>
<li>24’’ x 38.1 km long connecting pipeline from GBS to 3<sup>rd</sup> Pipeline PLEM</li>
</ol>
<p>The main project contractors employed to perform the PTT external pipeline survey was PTSC Offshore Services JSC (POS), who utilised PTSC’s vessel (PTSC Binh Minh), operating one (1) work-class and one (1) observation-class ROV. POS sub-contracted survey and navigation services to Green Star Positioning JSC for survey, data processing and navigation spread and Fugro Singapore Pte Ltd for CP (Cathodic Protection) survey.</p>
<p>The inspection and survey tasks were performed as per the requirements outlined within the documents Appendix 3 – ROV Subsea Pipeline Survey Procedure and Appendix 4 – ROV Subsea Structural Survey Procedure of POS-PTT-OPES-001.</p>
<p>The routine inspection video and anomaly video clips were recorded utilising Visualsoft software suite in (ASF) advanced systems format and event logs were recorded using Visualsoft Eventing module.</p>
<p>Summary of the pipeline survey work scope consisted of:</p>
<ul>
<li>General visual inspection of fiv (5) pipelines</li>
<li>Damage (including leaks)</li>
<li>Debris (which may affect the integrity of the pipeline)</li>
<li>Freespan suspensions (which may affect the stability of the pipeline)</li>
<li>Movement (lateral or vertical)</li>
<li>Level of cathodic protection</li>
</ul>
<p>During the course of survey, additional scopes to measure gas leaks at KP 131.194 tie-in skid of 32” pipeline BKT – ERP and KP 136.588 PLEM of 42” pipeline JDA KP60.4 – ERP was requested by the Client. Leak measurement tasks were carried out as per Gas Measurement Procedure. The Client also requested to have a look at the Tantawan PLEM for diver access.</p>
<p>All survey and inspection tasks were conducted utilising PTSC’s vessel M.V. PTSC Binh Minh and using the SMD Quantum 4 work class ROV and Seaeye Tiger 865 observation class ROV. Digital video and data recording and survey data acquisition were performed using QINSy and Visual Soft software systems.</p>
<p>The Pipeline Survey commenced on the 15<sup>th</sup> August 2018 and completed on the 25<sup>th</sup> September 2018.</p>
<p>The post <a href="https://gts.com.vn/project/offshore-pipeline-external-survey-and-jackets-inspection-2018-ptt/">Offshore Pipeline External Survey And Jackets Inspection 2018 (PTT)</a> appeared first on <a href="https://gts.com.vn">GreenStar Technical Services JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
